Injection Moulding Machine (IMM) Operator

Location: Palghar (Maharashtra)

Job Overview

Experience: 01 - 09 Years

Salary: 20000-25000 INR CTC Per Month

Gender: Male

Function: Operations & Maintenance Engineer

Job ID: 51573

Post Live On: Feb 17, 2025

Renewed On: Jun 02, 2026

Valid Upto: Jul 02, 2026

Job Type: Full Time

PWD: No

Primary Qualification

Qualification:
Diploma

Course:
Diploma

Specialization:
Mechanical Engineering

Additional Info

Open to Hire Local Candidates:

Working Hours:

Accomodation:

Mandatory Requisite:

Job Description

Job Summary :

Training Module & Outcomes – Injection Moulding Machine (IMM) Operator

Education: ITI in Plastic Processing Operator, Diploma in Mechanical, B. Tech in Mechanical

Apprenticeship

HARDWARE:

A.     Toyo Brand: Fully Electric Pressure Japanese IMM 180 Tonne Clamping Force

B.     Prikan Brand: High Speed Hydraulic Pressure Made in India IMM, 110 Tonne Clamping Force.

 

Mould Mechanical Installation

1.     Training: How to install a new mould on an Injection Moulding machine mechanically.

·        Outcome: Will learn the use of Chain Pulley Blocks, Alignment, Machine Setting Mode Usage, Clamping Torque Force, Scientific Clamps & Platen Mounted Moulds, Precise Alignments as needed for Thin Wall Moulding. Also the Installation of Cooling Lines, Air Flow Ejections through Manifold, Hot Runner Connections and Ejector systems through stripper or ejector rods, depending on which side ejection is planned.

 

Mould Opening & Closing Stages and Speeds

2.     Training: How to set the distances of Opening, closing and speeds.

·        Outcome: Will learn the optimum mould opening distances, stages of speed to avoid jerks and yet minimise cycle time.

 

Basic settings

3.     Training: How to set the Temperature, Speed & Pressure for Injection & Holding Stages.

·        Outcome: Will learn the science of raw materials, Melt Flow Index, range of above parameters per RM, how to go from single stage to multi Stage Injection, Holding, Suck back, Cooling and Plasticising stages. This will ensure no Flash, cuts or deformities and yet optimise cycle time & power consumption.

 

Optimisation

4.     Training: How to use new age features of parallel cooling, Plastification& Mould opening / closing to minimise cycle time with no impact on output quality.

Outcome: This will bring in expertise for reducing costs or increasing output in the same time using the super advanced features in the machines. This will help set the benchmark for KWh per kg calculation, a tough and powerful parameter.

 

Company Info

Company: Yellow Sparks International

Type: Food Industry

Contact Person: Gautam Dalal

Email: gxxxxx@yellowsparks.in

Phone: 99xxxxx46

Website: https://g.co/kgs/GxZnKYU

Address: B15 - 113&114, HDIL Industrial Park, Chandansar, Virar East